Expiration
If a
task
was
delayed
and
was not completed
, it is possible to set
rules
, which
change the dates
,
automatically postpone the task, complete
the
task
, etc.
To
enable
the rules,
check
the box
Enable
(1)
and then choose required scenarios
(2-4)
.